ADU Rules and Costs in Camarillo

December 4, 2025

Thinking about adding a backyard home or converting space into an ADU in Camarillo? You might be aiming for rental income, a private suite for family, or a boost to your property’s value. The good news is California law makes ADUs more achievable than ever, and Camarillo follows those rules with a clear permit path. In this guide, you’ll learn what you can build, how permits work, realistic timelines and costs, and where to get official answers. Let’s dive in.

What counts as an ADU in Camarillo

An accessory dwelling unit is a secondary home on the same lot as your primary residence. You can often choose from four types:

  • Detached ADU, a stand-alone backyard home.
  • Attached ADU, added onto your main house.
  • Interior conversion ADU, created within existing space such as a garage or basement.
  • Junior ADU, a smaller unit within the primary home that is limited to 500 square feet.

State rules shape every ADU project in Camarillo, so understanding those basics helps you design the right fit for your lot and budget.

State rules that shape ADUs

California sets the baseline through statewide law. The California Department of Housing and Community Development ADU guidance and California Government Code section 65852.2 explain the framework that local cities must follow.

  • Size: State law generally allows ADUs up to 1,200 square feet. Junior ADUs are limited to 500 square feet.
  • Setbacks: Many detached ADUs are allowed with side and rear setbacks as small as 4 feet, subject to fire and safety requirements.
  • Parking: Additional parking cannot be required in several common cases, including when the ADU is within one half mile of public transit or when you convert existing space. Cities can require parking in some situations, but only within state limits.
  • Owner occupancy: State law has relaxed most owner-occupancy mandates for newer ADUs. Always check current local policy before you apply.
  • Approval standard: Cities must process compliant ADUs ministerially, which means no discretionary hearing.
  • Review timeline: For a complete application, the city must approve or deny within about 60 days. If your submittal is incomplete, the city will request corrections, and the 60-day clock resumes once you resubmit a complete package.

These rules keep the process objective and predictable while leaving room for local design standards that are objective and safety-driven.

How Camarillo’s permit path works

Camarillo’s Community Development Department oversees planning and building for ADUs. Expect to work with the Planning Division, the Building and Safety Division, the City Engineer for utilities and grading, and the local fire authority for site safety.

A typical path looks like this:

  1. Pre-application conversation. This is optional but helpful. You can confirm zoning, setbacks, height, and any design standards that apply. Start with the City of Camarillo Community Development team.

  2. Prepare a complete submittal. Your package usually includes a site plan, floor plans, elevations, structural details for any new structure, and energy compliance documents. If you need new water or sewer service, coordinate early with the City Engineer.

  3. Planning review. Staff reviews for consistency with objective standards such as setbacks, height, lot coverage, and any adopted design criteria. In some areas, like planned developments or historic overlays, additional but still objective standards may apply.

  4. Building plan check. The Building & Safety Division checks structural, energy, plumbing, electrical, and mechanical details.

  5. Permit issuance and inspections. After plan check corrections are cleared, the city issues your building permit. Construction moves forward with scheduled inspections.

  6. Final approval. Once inspections pass, the city issues final occupancy documentation.

This process is ministerial for ADUs that meet objective standards, which keeps it more predictable than many other project types.

Timelines from idea to keys

Your total timeline depends on design complexity, plan check rounds, contractor availability, and site conditions. Typical ranges are:

  • Pre-application meeting scheduling: 1 to 4 weeks.
  • Design and permit package preparation: 2 to 8 or more weeks.
  • City review and plan check: 4 to 12 weeks, depending on completeness and revisions.
  • Permit issuance after approvals: 1 to 4 weeks.
  • Construction: 3 to 9 months. Interior conversions are usually faster. Detached new builds take longer.
  • Final inspection and occupancy: 1 to 4 weeks after construction.

Remember, the state’s 60-day decision timeline applies to complete applications. The design and preparation period before submittal is separate, and plan check cycles can add time.

Costs you should plan for

Every site is different, but you can set expectations with these common cost categories and ranges.

Permit and plan-check fees

Camarillo charges building permit, plan-check, and inspection fees. These are often based on your project valuation and can range from a few hundred dollars for small plan checks to several thousand dollars or more for larger builds. Many mid-size projects see total municipal permit costs in the low thousands to around the ten-thousand range, depending on scope.

Impact and connection fees

Water, sewer, school, and park fees vary by unit size and whether you need a new service connection. State law limits or exempts some impact fees for smaller ADUs and JADUs, and larger ADUs may be charged proportionate fees. If a separate water or sewer connection is required, capacity or connection fees can add a few thousand up to tens of thousands. Coordinate early with the City Engineer to understand whether your project triggers these costs.

Construction cost ranges in California

  • Interior conversion ADU: roughly 30,000 to 125,000 dollars, depending on finishes and system upgrades.
  • Attached ADU: roughly 100,000 to 250,000 dollars or more, depending on size and complexity.
  • Detached ADU: roughly 150,000 to 400,000 dollars or more, depending on square footage, site work, utilities, and finishes. High-end builds or difficult sites can exceed 400,000 dollars.

Soft costs and why budgets vary

Soft costs include architectural and engineering design, soils or structural reports, Title 24 energy compliance, and permit fees. These often total 10 to 20 percent or more of construction cost. Overall budgets vary due to foundation work, grading, trenching for utilities, fire sprinklers, accessibility upgrades, site constraints such as slopes or trees, and local labor and material pricing.

Parking, utilities, and rentals

Parking requirements are limited by state law. Many ADUs do not require additional parking, especially interior conversions, JADUs, or units within one half mile of public transit. If your project does require parking, the city must follow state limits on what can be required. Confirm your site’s specifics with the Planning Division.

Utility planning is critical. Some ADUs share existing water and sewer lines, while others need a separate connection. If your project needs new service or exceeds capacity, you may face connection or capacity fees. Discuss your plan with the City Engineer early so you can design cost-effective solutions.

Fire and life safety measures depend on your location and design. The local fire authority may require defensible space, smoke and carbon monoxide detectors, and in some cases fire sprinklers. Ask about these requirements during pre-application.

Rentals are a common goal. Long-term rental of ADUs is generally allowed under state law. Short-term rentals are regulated locally, so check Camarillo’s current rules and any licensing or registration requirements before you advertise your unit.

Financing your ADU

Homeowners in Camarillo often use a mix of financing options:

  • Home equity loans or HELOCs for flexible, secured funding.
  • Cash-out refinance to lock a single mortgage with project funds.
  • Construction loans tailored to phased draws.
  • FHA 203(k) or Fannie Mae renovation options where eligible.
  • Specialized ADU lenders. Some lenders consider projected rental income in loan sizing.

Compare rates and terms, and ask each lender how they treat ADU rental income and draw schedules for construction.

Smart first steps in Camarillo

Set yourself up for a smooth process with a focused checklist.

  • Confirm zoning and parcel constraints with the City of Camarillo Community Development team. Ask about setbacks, height, lot coverage, and any objective design standards.
  • Review CC&Rs or HOA rules if applicable. Private restrictions can be more limiting than city rules.
  • Pull basic parcel info. Locate utilities, easements, slopes, flood hazards, and trees that affect siting.
  • Decide your unit type and size. Consider interior conversion, attached, detached, or a 500 square foot JADU.
  • Map access and privacy. Plan for a safe path, lighting, and separate entry if desired.
  • Draft a realistic budget. Include construction, soft costs, and a reserve for unforeseen site work.
  • Line up your team. Talk to an ADU-experienced designer and contractor about scope, sequencing, and timelines.
  • Coordinate utilities and fire safety early. Ask the City Engineer and fire authority about connections and any sprinkler triggers.

Get local help

If you want a grounded view of feasibility, potential rent, and your likely permit path, a local consult goes a long way. Review your parcel details, talk through costs and timelines, and build a plan that fits your goals and budget. When you are ready, connect with Truth Realty for local guidance and to schedule a free consultation.

FAQs

How long does ADU approval take in Camarillo?

  • For a complete application, state law calls for a ministerial decision in about 60 days, and the overall plan, permit, and build timeline commonly spans 4 to 12 months.

What does a detached ADU cost in Camarillo?

  • Detached ADUs in California often range from about 150,000 to 400,000 dollars or more, plus permits and potential impact or connection fees that depend on your site.

Do I need to add parking for an ADU in Camarillo?

  • Often no, especially for interior conversions, JADUs, or sites within one half mile of public transit, though limited parking may be required in other cases within state rules.

Can I rent my Camarillo ADU short-term?

  • Long-term rental is generally allowed under state law, while short-term rentals are governed locally, so confirm current Camarillo rules and any required registration.

Will Camarillo require owner-occupancy for my ADU?

  • State law has relaxed most owner-occupancy requirements for newer ADUs, but you should verify the latest local policy before recording any deed restrictions.

Which permits should I submit first for a Camarillo ADU?

  • Start with a Planning discussion or pre-application, then submit a complete ADU package for ministerial Planning review and Building plan check with the City of Camarillo.